194 standards listed here, with 2,391,652 citation items between them.
| Standard | Short title | Citation items | Median proposed penalty | Ended at $0 |
|---|---|---|---|---|
| 1910.1200(e)(1) | Hazard communication written program | 102,287 | $750 | 47.2% |
| 1910.212(a)(1) | Machine guarding | 89,217 | $1,050 | 21.9% |
| 1910.219(d)(1) | Mechanical power-transmission guarding | 54,635 | $300 | 39.3% |
| 1910.215(b)(9) | General industry 1910.215(b)(9) requirement | 54,254 | $600 | 73.4% |
| 1910.212(a)(3)(ii) | Machine guarding | 51,699 | $640 | 21.0% |
| 1910.1200(h) | Hazard communication | 50,680 | $525 | 64.8% |
| 1910.215(a)(4) | General industry 1910.215(a)(4) requirement | 46,711 | $540 | 62.7% |
| 1910.23(c)(1) | General industry 1910.23(c)(1) requirement | 46,610 | $700 | 36.6% |
| 1910.151(c) | General industry 1910.151(c) requirement | 43,770 | $875 | 37.5% |
| 1910.132(a) | General industry 1910.132(a) requirement | 37,946 | $750 | 36.8% |
| 1910.22(a)(1) | Walking-working surfaces housekeeping | 37,934 | $630 | 60.2% |
| 1910.219(e)(3)(i) | Mechanical power-transmission apparatus | 35,797 | $180 | 74.1% |
| 1910.1200(g)(1) | Hazard communication | 35,325 | $500 | 76.3% |
| 1910.1200(h)(1) | Hazard communication training | 32,976 | $1,785 | 79.1% |
| 1910.242(b) | General industry 1910.242(b) requirement | 32,470 | $700 | 48.9% |
| 1910.309(a)(25045) | General industry 1910.309(a)(25045) requirement | 31,381 | $30 | 65.2% |
| 1910.133(a)(1) | General industry 1910.133(a)(1) requirement | 31,041 | $600 | 44.4% |
| 1910.219(e)(1)(i) | Mechanical power-transmission apparatus | 29,649 | $150 | 76.8% |
| 1910.219(f)(3) | Mechanical power-transmission apparatus | 28,216 | $400 | 39.1% |
| 1910.147(c)(1) | Lockout/tagout | 27,842 | $1,100 | 16.0% |
| 1910.212(a)(5) | Machine guarding | 27,273 | $240 | 62.2% |
| 1910.147(c)(4)(i) | Lockout/tagout procedures | 25,985 | $2,250 | 29.1% |
| 1910.37(q)(1) | Exit routes | 24,510 | $450 | 87.8% |
| 1910.309(a)(11017) | General industry 1910.309(a)(11017) requirement | 23,189 | $45 | 61.8% |
| 1910.215(a)(2) | General industry 1910.215(a)(2) requirement | 22,206 | $165 | 55.0% |
| 1910.303(g)(2)(i) | General industry 1910.303(g)(2)(i) requirement | 21,673 | $750 | 26.6% |
| 1910.178(p)(1) | Powered industrial trucks | 21,280 | $1,050 | 59.4% |
| 1910.1200(g)(8) | Hazard communication | 20,841 | $750 | 78.4% |
| 1910.1200(f)(5)(i) | Hazard communication | 20,603 | $750 | 60.1% |
| 1910.22(d)(1) | Walking-working surfaces | 20,236 | $750 | 85.2% |
| 1910.213(h)(1) | General industry 1910.213(h)(1) requirement | 20,185 | $210 | 27.6% |
| 1910.305(b)(1) | Electrical wiring methods | 19,165 | $825 | 53.9% |
| 1910.304(f)(4) | General industry 1910.304(f)(4) requirement | 18,892 | $540 | 42.1% |
| 1910.305(b)(2) | Electrical wiring methods | 17,921 | $750 | 61.2% |
| 1910.1200(f)(5)(ii) | Hazard communication | 17,773 | $600 | 89.1% |
| 1910.147(c)(7)(i) | Lockout/tagout | 16,954 | $1,800 | 53.6% |
| 1910.134(e)(1) | General industry 1910.134(e)(1) requirement | 16,883 | $1,966 | 67.6% |
| 1910.305(g)(2)(iii) | Electrical wiring methods | 16,042 | $1,225 | 63.6% |
| 1910.309(a)(11022) | General industry 1910.309(a)(11022) requirement | 15,701 | $30 | 91.2% |
| 1910.134(c)(1) | General industry 1910.134(c)(1) requirement | 15,034 | $1,702 | 35.2% |
| 1910.22(a)(2) | Walking-working surfaces | 14,952 | $900 | 57.0% |
| 1910.176(b) | General industry 1910.176(b) requirement | 14,562 | $1,083 | 41.9% |
| 1910.213(h)(4) | General industry 1910.213(h)(4) requirement | 14,453 | $375 | 81.2% |
| 1910.157(c)(1) | General industry 1910.157(c)(1) requirement | 14,346 | $1,050 | 66.3% |
| 1910.303(b)(2) | General industry 1910.303(b)(2) requirement | 14,012 | $1,500 | 36.7% |
| 1910.147(c)(6)(i) | Lockout/tagout | 13,904 | $2,550 | 55.1% |
| 1910.305(g)(1)(iii) | Electrical wiring methods | 13,684 | $750 | 66.5% |
| 1910.303(f) | General industry 1910.303(f) requirement | 13,579 | $800 | 67.0% |
| 1910.132(d)(2) | General industry 1910.132(d)(2) requirement | 13,437 | $1,200 | 75.1% |
| 1910.178(l)(1)(i) | Powered industrial truck training | 13,213 | $2,100 | 16.9% |
| 1910.132(d)(1) | General industry 1910.132(d)(1) requirement | 13,066 | $1,750 | 44.8% |
| 1910.157(g)(1) | General industry 1910.157(g)(1) requirement | 12,489 | $1,000 | 61.8% |
| 1910.304(f)(5)(v) | General industry 1910.304(f)(5)(v) requirement | 12,444 | $420 | 50.7% |
| 1910.95(c)(1) | General industry 1910.95(c)(1) requirement | 12,058 | $1,625 | 40.5% |
| 1910.134(b)(1) | General industry 1910.134(b)(1) requirement | 12,045 | $450 | 81.8% |
| 1910.252(a)(2)(ivc) | General industry 1910.252(a)(2)(ivc) requirement | 11,742 | $150 | 83.6% |
| 1910.134(a)(2) | General industry 1910.134(a)(2) requirement | 11,276 | $600 | 56.4% |
| 1910.37(k)(2) | Exit routes | 11,247 | $630 | 62.8% |
| 1910.1000(e) | General industry 1910.1000(e) requirement | 11,114 | $1,000 | 95.6% |
| 1910.95(b)(1) | General industry 1910.95(b)(1) requirement | 11,018 | $560 | 55.1% |
| 1910.1200(e)(1)(i) | Hazard communication | 10,825 | $825 | 79.4% |
| 1910.20(g)(2) | General industry 1910.20(g)(2) requirement | 10,506 | $360 | 98.7% |
| 1910.151(b) | General industry 1910.151(b) requirement | 10,485 | $600 | 77.0% |
| 1910.309(a)(40004) | General industry 1910.309(a)(40004) requirement | 10,441 | $40 | 87.6% |
| 1910.309(a) | General industry 1910.309(a) requirement | 10,101 | $30 | 67.6% |
| 1910.212(b) | Machine guarding | 10,066 | $1,000 | 63.5% |
| 1910.147(c)(4)(ii) | Lockout/tagout | 10,027 | $1,875 | 36.6% |
| 1910.217(c)(1)(i) | General industry 1910.217(c)(1)(i) requirement | 9,983 | $450 | 21.5% |
| 1910.36(b)(4) | General industry 1910.36(b)(4) requirement | 9,977 | $600 | 46.7% |
| 1910.178(l) | Powered industrial trucks | 9,827 | $750 | 49.1% |
| 1910.22(b)(1) | Walking-working surfaces | 9,823 | $480 | 63.3% |
| 1910.157(d)(3)(i) | General industry 1910.157(d)(3)(i) requirement | 9,702 | $30 | 86.5% |
| 1910.106(e)(6)(ii) | General industry 1910.106(e)(6)(ii) requirement | 9,547 | $525 | 61.7% |
| 1910.157(g)(2) | General industry 1910.157(g)(2) requirement | 9,475 | $975 | 53.8% |
| 1910.219(c)(2)(i) | Mechanical power-transmission apparatus | 9,147 | $975 | 38.9% |
| 1910.134(f)(2) | General industry 1910.134(f)(2) requirement | 8,845 | $2,425 | 78.6% |
| 1910.217(e)(1)(i) | General industry 1910.217(e)(1)(i) requirement | 8,814 | $900 | 70.7% |
| 1910.213(c)(1) | General industry 1910.213(c)(1) requirement | 8,805 | $300 | 18.6% |
| 1910.107(b)(5)(i) | General industry 1910.107(b)(5)(i) requirement | 8,684 | $600 | 60.0% |
| 1910.157(a)(5) | General industry 1910.157(a)(5) requirement | 8,596 | $30 | 95.4% |
| 1910.101(b) | General industry 1910.101(b) requirement | 8,562 | $875 | 46.8% |
| 1910.219(f)(1) | Mechanical power-transmission apparatus | 8,515 | $300 | 47.9% |
| 1910.157(e)(3) | General industry 1910.157(e)(3) requirement | 8,510 | $750 | 82.4% |
| 1910.253(b)(4)(iii) | General industry 1910.253(b)(4)(iii) requirement | 8,414 | $1,050 | 38.6% |
| 1910.178(l)(6) | Powered industrial trucks | 8,172 | $1,400 | 76.9% |
| 1910.178(q)(7) | Powered industrial trucks | 7,941 | $1,600 | 69.0% |
| 1910.304(a)(2) | General industry 1910.304(a)(2) requirement | 7,907 | $700 | 66.0% |
| 1910.219(b)(1) | Mechanical power-transmission apparatus | 7,870 | $382 | 39.3% |
| 1910.107(c)(6) | General industry 1910.107(c)(6) requirement | 7,853 | $350 | 50.8% |
| 1910.303(b)(1) | General industry 1910.303(b)(1) requirement | 7,810 | $1,125 | 24.3% |
| 1910.106(e)(6)(i) | General industry 1910.106(e)(6)(i) requirement | 7,549 | $600 | 52.9% |
| 1910.37(a)(3) | Exit route maintenance | 7,537 | $2,550 | 30.2% |
| 1910.38(a)(1) | General industry 1910.38(a)(1) requirement | 7,417 | $750 | 55.7% |
| 1910.303(g)(1)(ii) | General industry 1910.303(g)(1)(ii) requirement | 7,414 | $1,200 | 58.8% |
| 1910.22(b)(2) | Walking-working surfaces | 7,159 | $100 | 84.9% |
| 1910.22(c) | Walking-working surfaces | 7,159 | $500 | 40.9% |
| 1910.107(g)(2) | General industry 1910.107(g)(2) requirement | 7,126 | $500 | 66.2% |
| 1910.309(a)(25051) | General industry 1910.309(a)(25051) requirement | 7,114 | $40 | 78.1% |
| 1910.106(e)(2)(ivd) | General industry 1910.106(e)(2)(ivd) requirement | 7,082 | $500 | 63.7% |
| 1910.134(c)(2)(i) | General industry 1910.134(c)(2)(i) requirement | 7,015 | $1,050 | 85.6% |
| 1910.134(f)(1) | General industry 1910.134(f)(1) requirement | 6,982 | $1,125 | 85.6% |
| 1910.157(a)(2) | General industry 1910.157(a)(2) requirement | 6,971 | $30 | 89.1% |
| 1910.157(c)(4) | General industry 1910.157(c)(4) requirement | 6,960 | $750 | 72.2% |
| 1910.178(l)(4)(iii) | Powered industrial trucks | 6,904 | $2,100 | 49.8% |
| 1910.215(a)(1) | General industry 1910.215(a)(1) requirement | 6,797 | $175 | 39.9% |
| 1910.107(e)(2) | General industry 1910.107(e)(2) requirement | 6,747 | $375 | 61.8% |
| 1910.20(g)(1)(i) | General industry 1910.20(g)(1)(i) requirement | 6,731 | $500 | 90.4% |
| 1910.25(d)(1)(x) | General industry 1910.25(d)(1)(x) requirement | 6,641 | $80 | 79.7% |
| 1910.213(i)(1) | General industry 1910.213(i)(1) requirement | 6,500 | $350 | 45.0% |
| 1910.213(c)(3) | General industry 1910.213(c)(3) requirement | 6,464 | $480 | 85.8% |
| 1910.24(h) | General industry 1910.24(h) requirement | 6,457 | $750 | 59.6% |
| 1910.23(a)(8) | General industry 1910.23(a)(8) requirement | 6,410 | $750 | 50.6% |
| 1910.1025(d)(2) | General industry 1910.1025(d)(2) requirement | 6,353 | $750 | 65.4% |
| 1910.20(g)(1)(iii) | General industry 1910.20(g)(1)(iii) requirement | 6,342 | $320 | 98.2% |
| 1910.219(c)(4)(i) | Mechanical power-transmission apparatus | 6,314 | $1,100 | 52.1% |
| 1910.305(g)(2)(ii) | Electrical wiring methods | 6,310 | $1,000 | 59.1% |
| 1910.252(a)(2)(iib) | General industry 1910.252(a)(2)(iib) requirement | 6,263 | $180 | 77.5% |
| 1910.23(d)(1)(iii) | General industry 1910.23(d)(1)(iii) requirement | 6,169 | $600 | 66.7% |
| 1910.95(d)(1) | General industry 1910.95(d)(1) requirement | 6,083 | $1,360 | 68.2% |
| 1910.36(d)(1) | General industry 1910.36(d)(1) requirement | 6,059 | $1,500 | 42.3% |
| 1910.157(e)(2) | General industry 1910.157(e)(2) requirement | 6,035 | $1,000 | 79.4% |
| 1910.37(q)(2) | Exit routes | 6,007 | $750 | 87.5% |
| 1910.213(d)(1) | General industry 1910.213(d)(1) requirement | 5,878 | $320 | 23.7% |
| 1910.217(b)(4)(i) | General industry 1910.217(b)(4)(i) requirement | 5,842 | $450 | 48.1% |
| 1910.176(a) | General industry 1910.176(a) requirement | 5,706 | $1,500 | 57.6% |
| 1910.179(j)(2)(iii) | General industry 1910.179(j)(2)(iii) requirement | 5,630 | $750 | 70.6% |
| 1910.213(c)(2) | General industry 1910.213(c)(2) requirement | 5,620 | $540 | 79.4% |
| 1910.106(g)(8) | General industry 1910.106(g)(8) requirement | 5,595 | $35 | 91.4% |
| 1910.138(a) | General industry 1910.138(a) requirement | 5,558 | $2,000 | 57.5% |
| 1910.107(g)(7) | General industry 1910.107(g)(7) requirement | 5,556 | $200 | 86.2% |
| 1910.23(d)(1)(ii) | General industry 1910.23(d)(1)(ii) requirement | 5,517 | $500 | 72.4% |
| 1910.134(b)(6) | General industry 1910.134(b)(6) requirement | 5,487 | $350 | 90.7% |
| 1910.95(k)(1) | General industry 1910.95(k)(1) requirement | 5,428 | $1,500 | 78.0% |
| 1910.106(e)(2)(iva) | General industry 1910.106(e)(2)(iva) requirement | 5,408 | $420 | 55.6% |
| 1910.1030(c)(1)(i) | General industry 1910.1030(c)(1)(i) requirement | 5,403 | $1,375 | 31.3% |
| 1910.106(e)(9)(iii) | General industry 1910.106(e)(9)(iii) requirement | 5,358 | $600 | 67.3% |
| 1910.1025(l)(1)(i) | General industry 1910.1025(l)(1)(i) requirement | 5,354 | $900 | 73.8% |
| 1910.141(a)(3)(i) | General industry 1910.141(a)(3)(i) requirement | 5,325 | $700 | 72.9% |
| 1910.147(d)(4)(i) | Lockout/tagout | 5,273 | $3,000 | 48.4% |
| 1910.157(a)(1) | General industry 1910.157(a)(1) requirement | 5,272 | $30 | 86.2% |
| 1910.20(g)(1)(ii) | General industry 1910.20(g)(1)(ii) requirement | 5,255 | $320 | 98.6% |
| 1910.184(e)(1) | General industry 1910.184(e)(1) requirement | 5,194 | $1,000 | 69.7% |
| 1910.134(d)(1)(iii) | General industry 1910.134(d)(1)(iii) requirement | 5,179 | $2,000 | 61.4% |
| 1910.219(i)(2) | Mechanical power-transmission apparatus | 5,158 | $350 | 66.4% |
| 1910.1000(a)(2) | General industry 1910.1000(a)(2) requirement | 5,105 | $1,400 | 49.2% |
| 1910.217(c)(2)(ia) | General industry 1910.217(c)(2)(ia) requirement | 5,103 | $637 | 27.0% |
| 1910.179(m)(1) | General industry 1910.179(m)(1) requirement | 5,061 | $300 | 84.7% |
| 1910.213(b)(3) | General industry 1910.213(b)(3) requirement | 5,011 | $675 | 36.2% |
| 1910.157(d)(2)(i) | General industry 1910.157(d)(2)(i) requirement | 5,003 | $30 | 91.1% |
| 1910.107(b)(5)(iv) | General industry 1910.107(b)(5)(iv) requirement | 4,900 | $600 | 60.1% |
| 1910.147(c)(5)(i) | Lockout/tagout | 4,857 | $1,350 | 44.8% |
| 1910.252(e)(2)(iii) | General industry 1910.252(e)(2)(iii) requirement | 4,841 | $50 | 61.6% |
| 1910.134(b)(3) | General industry 1910.134(b)(3) requirement | 4,796 | $600 | 86.1% |
| 1910.1000(c) | General industry 1910.1000(c) requirement | 4,768 | $1,000 | 55.1% |
| 1910.307(b) | General industry 1910.307(b) requirement | 4,741 | $720 | 39.9% |
| 1910.213(h)(3) | General industry 1910.213(h)(3) requirement | 4,725 | $240 | 69.0% |
| 1910.179(b)(5) | General industry 1910.179(b)(5) requirement | 4,705 | $350 | 80.2% |
| 1910.95(g)(1) | General industry 1910.95(g)(1) requirement | 4,680 | $1,587 | 64.6% |
| 1910.305(b)(1)(ii) | Electrical wiring methods | 4,657 | $2,550 | 34.4% |
| 1910.242(a) | General industry 1910.242(a) requirement | 4,617 | $720 | 64.6% |
| 1910.132(f)(1) | General industry 1910.132(f)(1) requirement | 4,595 | $1,875 | 78.4% |
| 1910.37(b)(2) | Exit routes | 4,585 | $1,630 | 58.4% |
| 1910.157(a)(3) | General industry 1910.157(a)(3) requirement | 4,556 | $30 | 91.9% |
| 1910.147(c)(6)(ii) | Lockout/tagout | 4,546 | $1,875 | 80.5% |
| 1910.106(d)(2)(i) | General industry 1910.106(d)(2)(i) requirement | 4,537 | $450 | 61.7% |
| 1910.305(g)(1)(i) | Electrical wiring methods | 4,511 | $800 | 63.7% |
| 1910.157(d)(3)(iv) | General industry 1910.157(d)(3)(iv) requirement | 4,474 | $30 | 96.4% |
| 1910.252(a)(2)(ivc0) | General industry 1910.252(a)(2)(ivc0) requirement | 4,460 | $30 | 68.5% |
| 1910.243(c)(1) | General industry 1910.243(c)(1) requirement | 4,377 | $360 | 26.9% |
| 1910.243(c)(3) | General industry 1910.243(c)(3) requirement | 4,356 | $300 | 30.9% |
| 1910.134(b)(5) | General industry 1910.134(b)(5) requirement | 4,328 | $360 | 89.0% |
| 1910.332(b)(1) | General industry 1910.332(b)(1) requirement | 4,325 | $2,100 | 33.6% |
| 1910.95(l)(1) | General industry 1910.95(l)(1) requirement | 4,312 | $615 | 95.8% |
| 1910.24(b) | General industry 1910.24(b) requirement | 4,258 | $750 | 48.0% |
| 1910.67(c)(2)(v) | General industry 1910.67(c)(2)(v) requirement | 4,175 | $2,000 | 11.5% |
| 1910.23(c)(3) | General industry 1910.23(c)(3) requirement | 4,155 | $700 | 36.0% |
| 1910.107(b)(9) | General industry 1910.107(b)(9) requirement | 4,144 | $825 | 66.1% |
| 1910.37(q)(5) | Exit routes | 4,143 | $750 | 85.2% |
| 1910.178(a)(6) | Powered industrial trucks | 4,127 | $1,500 | 70.1% |
| 1910.219(e)(1) | Mechanical power-transmission apparatus | 4,074 | $35 | 68.1% |
| 1910.253(b)(2)(ii) | General industry 1910.253(b)(2)(ii) requirement | 4,062 | $1,000 | 32.1% |
| 1910.134(k)(1) | General industry 1910.134(k)(1) requirement | 4,041 | $1,400 | 85.9% |
| 1910.95(a) | General industry 1910.95(a) requirement | 4,039 | $300 | 18.0% |
| 1910.141(d)(2)(ii) | General industry 1910.141(d)(2)(ii) requirement | 4,022 | $600 | 88.2% |
| 1910.106(d)(4)(i) | General industry 1910.106(d)(4)(i) requirement | 3,993 | $525 | 52.7% |
| 1910.178(l)(1)(ii) | Powered industrial trucks | 3,981 | $2,400 | 19.0% |
| 1910.179(j)(3) | General industry 1910.179(j)(3) requirement | 3,976 | $1,300 | 71.5% |
| 1910.146(c)(2) | General industry 1910.146(c)(2) requirement | 3,956 | $1,995 | 61.0% |
| 1910.309(a)(40010) | General industry 1910.309(a)(40010) requirement | 3,950 | $35 | 91.6% |
| 1910.134(c)(2)(ii) | General industry 1910.134(c)(2)(ii) requirement | 3,882 | $1,800 | 63.7% |
| 1910.303(g)(1) | General industry 1910.303(g)(1) requirement | 3,875 | $2,365 | 46.6% |
| 1910.146(c)(1) | General industry 1910.146(c)(1) requirement | 3,862 | $1,750 | 27.8% |
| 1910.179(j)(2)(iv) | General industry 1910.179(j)(2)(iv) requirement | 3,846 | $450 | 84.1% |
| 1910.309(a)(25042) | General industry 1910.309(a)(25042) requirement | 3,835 | $40 | 63.6% |
29 CFR Part 1926 — Construction
96 standards listed here, with 1,306,707 citation items between them.
| Standard | Short title | Citation items | Median proposed penalty | Ended at $0 |
|---|---|---|---|---|
| 1926.501(b)(13) | Residential fall protection | 89,264 | $3,200 | 6.1% |
| 1926.100(a) | Construction 1926.100(a) requirement | 61,568 | $750 | 20.8% |
| 1926.501(b)(1) | Unprotected sides and edges fall protection | 46,410 | $2,000 | 9.6% |
| 1926.1053(b)(1) | Portable ladder extension | 43,190 | $2,000 | 14.2% |
| 1926.102(a)(1) | Construction 1926.102(a)(1) requirement | 40,753 | $1,800 | 17.5% |
| 1926.21(b)(2) | Construction safety training | 40,217 | $1,225 | 39.8% |
| 1926.503(a)(1) | Fall protection training program | 38,059 | $2,000 | 49.6% |
| 1926.59(e)(1) | Construction 1926.59(e)(1) requirement | 33,560 | $350 | 44.0% |
| 1926.652(a)(1) | Construction 1926.652(a)(1) requirement | 29,600 | $2,500 | 17.2% |
| 1926.20(b)(2) | Construction safety program inspections | 29,066 | $1,600 | 38.5% |
| 1926.451(g)(1) | Scaffold fall protection | 28,871 | $1,500 | 20.2% |
| 1926.20(b)(1) | Construction safety and health program | 28,488 | $900 | 40.5% |
| 1926.500(d)(1) | Construction 1926.500(d)(1) requirement | 27,283 | $320 | 23.6% |
| 1926.453(b)(2)(v) | Construction 1926.453(b)(2)(v) requirement | 26,086 | $1,700 | 10.0% |
| 1926.25(a) | Construction 1926.25(a) requirement | 25,229 | $450 | 57.3% |
| 1926.451(e)(1) | Scaffold access | 23,856 | $1,500 | 18.7% |
| 1926.59(h) | Construction 1926.59(h) requirement | 23,733 | $360 | 57.2% |
| 1926.404(b)(1)(i) | Construction 1926.404(b)(1)(i) requirement | 22,431 | $600 | 30.7% |
| 1926.404(f)(6) | Construction 1926.404(f)(6) requirement | 21,370 | $600 | 47.2% |
| 1926.400(h)(1) | Construction 1926.400(h)(1) requirement | 21,133 | $200 | 66.9% |
| 1926.451(b)(1) | Scaffolds | 20,190 | $1,500 | 11.4% |
| 1926.501(b)(10) | Roofing low-slope fall protection | 18,620 | $2,520 | 9.2% |
| 1926.28(a) | Construction 1926.28(a) requirement | 18,394 | $420 | 22.9% |
| 1926.454(a) | Construction 1926.454(a) requirement | 16,170 | $1,500 | 49.8% |
| 1926.59(g)(1) | Construction 1926.59(g)(1) requirement | 15,590 | $300 | 65.2% |
| 1926.451(d)(10) | Scaffolds | 15,014 | $450 | 18.4% |
| 1926.651(c)(2) | Construction 1926.651(c)(2) requirement | 13,627 | $1,500 | 15.3% |
| 1926.152(a)(1) | Construction 1926.152(a)(1) requirement | 13,546 | $300 | 68.7% |
| 1926.651(k)(1) | Construction 1926.651(k)(1) requirement | 13,003 | $1,500 | 32.4% |
| 1926.501(b)(11) | Fall protection duty to have protection | 12,281 | $2,800 | 9.9% |
| 1926.451(a)(4) | Scaffolds | 11,971 | $300 | 29.3% |
| 1926.451(g)(1)(vii) | Scaffolds | 11,659 | $1,966 | 18.5% |
| 1926.50(f) | Construction 1926.50(f) requirement | 11,475 | $120 | 95.4% |
| 1926.350(a)(9) | Construction 1926.350(a)(9) requirement | 11,262 | $450 | 65.0% |
| 1926.651(j)(2) | Construction 1926.651(j)(2) requirement | 10,938 | $1,500 | 21.9% |
| 1926.401(c) | Construction 1926.401(c) requirement | 10,695 | $150 | 80.3% |
| 1926.500(b)(1) | Construction 1926.500(b)(1) requirement | 10,581 | $300 | 28.9% |
| 1926.1052(c)(1) | Construction 1926.1052(c)(1) requirement | 10,431 | $750 | 27.6% |
| 1926.304(f) | Construction 1926.304(f) requirement | 10,348 | $240 | 51.9% |
| 1926.451(c)(2) | Scaffolds | 10,046 | $1,125 | 29.6% |
| 1926.1053(b)(4) | Ladder use only as designed | 9,569 | $1,755 | 34.5% |
| 1926.401(a)(1) | Construction 1926.401(a)(1) requirement | 9,566 | $90 | 64.6% |
| 1926.450(a)(10) | Construction 1926.450(a)(10) requirement | 9,543 | $160 | 69.1% |
| 1926.1060(a) | Construction 1926.1060(a) requirement | 9,373 | $1,500 | 68.5% |
| 1926.701(b) | Construction 1926.701(b) requirement | 8,964 | $1,000 | 13.8% |
| 1926.404(b)(1)(ii) | Construction 1926.404(b)(1)(ii) requirement | 8,951 | $600 | 35.3% |
| 1926.59(g)(8) | Construction 1926.59(g)(8) requirement | 8,826 | $450 | 54.4% |
| 1926.451(g)(4)(i) | Scaffolds | 8,763 | $1,500 | 26.7% |
| 1926.451(f)(7) | Scaffolds | 8,745 | $1,500 | 39.0% |
| 1926.403(b)(2) | Construction 1926.403(b)(2) requirement | 8,383 | $750 | 40.1% |
| 1926.450(a)(9) | Construction 1926.450(a)(9) requirement | 8,383 | $175 | 59.8% |
| 1926.300(b)(2) | Construction 1926.300(b)(2) requirement | 8,335 | $250 | 36.4% |
| 1926.405(g)(2)(iv) | Construction 1926.405(g)(2)(iv) requirement | 8,273 | $750 | 60.9% |
| 1926.451(a)(13) | Scaffolds | 8,021 | $500 | 33.1% |
| 1926.95(a) | Construction 1926.95(a) requirement | 8,014 | $1,050 | 20.3% |
| 1926.416(e)(1) | Construction 1926.416(e)(1) requirement | 7,035 | $1,000 | 54.2% |
| 1926.1051(a) | Construction 1926.1051(a) requirement | 6,928 | $1,200 | 23.8% |
| 1926.150(c)(1)(i) | Construction 1926.150(c)(1)(i) requirement | 6,882 | $450 | 70.3% |
| 1926.50(d)(1) | Construction 1926.50(d)(1) requirement | 6,876 | $225 | 88.3% |
| 1926.503(b)(1) | Fall protection training | 6,838 | $1,250 | 79.5% |
| 1926.1053(b)(13) | Top step ladder use | 6,833 | $1,600 | 31.3% |
| 1926.451(f)(3) | Scaffolds | 6,645 | $1,500 | 37.2% |
| 1926.350(j) | Construction 1926.350(j) requirement | 6,468 | $360 | 68.4% |
| 1926.501(b)(4)(i) | Fall protection duty to have protection | 5,966 | $2,000 | 18.9% |
| 1926.500(e)(1)(iv) | Construction 1926.500(e)(1)(iv) requirement | 5,739 | $200 | 68.1% |
| 1926.405(a)(2)(iii) | Construction 1926.405(a)(2)(iii) requirement | 5,685 | $600 | 54.6% |
| 1926.500(e)(1)(iii) | Construction 1926.500(e)(1)(iii) requirement | 5,576 | $200 | 72.7% |
| 1926.403(i)(2)(i) | Construction 1926.403(i)(2)(i) requirement | 5,271 | $750 | 20.0% |
| 1926.651(i)(1) | Construction 1926.651(i)(1) requirement | 5,203 | $350 | 46.8% |
| 1926.450(a)(2) | Construction 1926.450(a)(2) requirement | 5,181 | $120 | 75.5% |
| 1926.405(b)(2) | Construction 1926.405(b)(2) requirement | 5,160 | $750 | 44.4% |
| 1926.550(b)(2) | Construction 1926.550(b)(2) requirement | 5,121 | $600 | 62.7% |
| 1926.652(b) | Construction 1926.652(b) requirement | 5,049 | $500 | 16.5% |
| 1926.1053(b)(16) | Ladders | 4,991 | $1,225 | 46.9% |
| 1926.501(b)(14) | Fall protection duty to have protection | 4,932 | $1,500 | 23.5% |
| 1926.451(e)(10) | Scaffolds | 4,834 | $320 | 35.9% |
| 1926.50(c) | Construction 1926.50(c) requirement | 4,818 | $450 | 72.5% |
| 1926.300(b)(1) | Construction 1926.300(b)(1) requirement | 4,725 | $750 | 15.3% |
| 1926.501(b)(4)(ii) | Fall protection duty to have protection | 4,532 | $1,200 | 24.7% |
| 1926.416(a)(1) | Construction 1926.416(a)(1) requirement | 4,502 | $2,800 | 20.3% |
| 1926.760(a)(1) | Construction 1926.760(a)(1) requirement | 4,492 | $2,800 | 10.6% |
| 1926.401(j)(1) | Construction 1926.401(j)(1) requirement | 4,489 | $40 | 85.8% |
| 1926.452(c)(2) | Construction 1926.452(c)(2) requirement | 4,460 | $1,250 | 34.0% |
| 1926.405(a)(2)(iie) | Construction 1926.405(a)(2)(iie) requirement | 4,420 | $600 | 51.7% |
| 1926.150(a)(1) | Construction 1926.150(a)(1) requirement | 4,413 | $450 | 68.3% |
| 1926.105(a) | Construction 1926.105(a) requirement | 4,306 | $1,000 | 14.7% |
| 1926.400(a) | Construction 1926.400(a) requirement | 4,189 | $160 | 74.8% |
| 1926.602(a)(9)(i) | Construction 1926.602(a)(9)(i) requirement | 4,156 | $450 | 62.9% |
| 1926.500(c)(1) | Construction 1926.500(c)(1) requirement | 4,145 | $350 | 27.5% |
| 1926.652(h) | Construction 1926.652(h) requirement | 4,127 | $240 | 60.4% |
| 1926.405(b)(1) | Construction 1926.405(b)(1) requirement | 4,084 | $750 | 43.8% |
| 1926.405(a)(2)(iij) | Construction 1926.405(a)(2)(iij) requirement | 4,073 | $450 | 72.1% |
| 1926.451(a)(2) | Scaffolds | 4,024 | $360 | 39.6% |
| 1926.602(a)(9)(ii) | Construction 1926.602(a)(9)(ii) requirement | 4,007 | $480 | 44.6% |
| 1926.451(d)(3) | Scaffolds | 3,948 | $420 | 49.8% |
| 1926.350(a)(1) | Construction 1926.350(a)(1) requirement | 3,867 | $400 | 59.4% |
29 CFR Part 1904 — Recordkeeping
7 standards listed here, with 109,175 citation items between them.
| Standard | Short title | Citation items | Median proposed penalty | Ended at $0 |
|---|---|---|---|---|
| 1904.2(a) | Recordkeeping 1904.2(a) requirement | 69,728 | $300 | 76.1% |
| 1904.5(a) | Recordkeeping 1904.5(a) requirement | 10,519 | $100 | 79.3% |
| 1904.39(a)(2) | Recordkeeping 1904.39(a)(2) requirement | 7,319 | $5,000 | 20.9% |
| 1904.29(b)(1) | Injury and illness recordkeeping | 7,046 | $900 | 50.7% |
| 1904.29(a) | Injury and illness recordkeeping | 5,039 | $700 | 56.4% |
| 1904.4 | Recordkeeping 1904.4 requirement | 4,976 | $100 | 77.6% |
| 1904.5(c) | Recordkeeping 1904.5(c) requirement | 4,548 | $320 | 87.3% |
29 CFR Part 1903 — OSHA inspection and citation procedure
3 standards listed here, with 79,288 citation items between them.
| Standard | Short title | Citation items | Median proposed penalty | Ended at $0 |
|---|---|---|---|---|
| 1903.2(a)(1) | OSHA inspection and citation procedure 1903.2(a)(1) requirement | 64,017 | $250 | 80.5% |
| 1903.2(a) | OSHA inspection and citation procedure 1903.2(a) requirement | 8,163 | $50 | 71.7% |
| 1903.19(c)(1) | OSHA inspection and citation procedure 1903.19(c)(1) requirement | 7,108 | $398 | 9.4% |
Federal OSHA citations by state
Guides: how OSHA penalties are calculated and reduced, the 15-working-day contest deadline, all guides.
CitationPack is private informational software, is not affiliated with OSHA, and does not provide legal advice. Review the methodology.