Most-cited federal OSHA standards

The 300 federal OSHA standards with the most citation items in public U.S. Department of Labor and OSHA enforcement records, grouped by CFR part. Each one links to the public penalty outcomes and comparable cases for that standard. State Plan records are excluded.

The underlying records hold 5,814,935 public federal OSHA citation items issued March 1972 – September 2026.

Medians are computed over items with a nonzero proposed penalty; the share that ended at $0 is shown separately.

29 CFR Part 1910 — General industry

194 standards listed here, with 2,391,652 citation items between them.

StandardShort titleCitation itemsMedian proposed penaltyEnded at $0
1910.1200(e)(1)Hazard communication written program102,287$75047.2%
1910.212(a)(1)Machine guarding89,217$1,05021.9%
1910.219(d)(1)Mechanical power-transmission guarding54,635$30039.3%
1910.215(b)(9)General industry 1910.215(b)(9) requirement54,254$60073.4%
1910.212(a)(3)(ii)Machine guarding51,699$64021.0%
1910.1200(h)Hazard communication50,680$52564.8%
1910.215(a)(4)General industry 1910.215(a)(4) requirement46,711$54062.7%
1910.23(c)(1)General industry 1910.23(c)(1) requirement46,610$70036.6%
1910.151(c)General industry 1910.151(c) requirement43,770$87537.5%
1910.132(a)General industry 1910.132(a) requirement37,946$75036.8%
1910.22(a)(1)Walking-working surfaces housekeeping37,934$63060.2%
1910.219(e)(3)(i)Mechanical power-transmission apparatus35,797$18074.1%
1910.1200(g)(1)Hazard communication35,325$50076.3%
1910.1200(h)(1)Hazard communication training32,976$1,78579.1%
1910.242(b)General industry 1910.242(b) requirement32,470$70048.9%
1910.309(a)(25045)General industry 1910.309(a)(25045) requirement31,381$3065.2%
1910.133(a)(1)General industry 1910.133(a)(1) requirement31,041$60044.4%
1910.219(e)(1)(i)Mechanical power-transmission apparatus29,649$15076.8%
1910.219(f)(3)Mechanical power-transmission apparatus28,216$40039.1%
1910.147(c)(1)Lockout/tagout27,842$1,10016.0%
1910.212(a)(5)Machine guarding27,273$24062.2%
1910.147(c)(4)(i)Lockout/tagout procedures25,985$2,25029.1%
1910.37(q)(1)Exit routes24,510$45087.8%
1910.309(a)(11017)General industry 1910.309(a)(11017) requirement23,189$4561.8%
1910.215(a)(2)General industry 1910.215(a)(2) requirement22,206$16555.0%
1910.303(g)(2)(i)General industry 1910.303(g)(2)(i) requirement21,673$75026.6%
1910.178(p)(1)Powered industrial trucks21,280$1,05059.4%
1910.1200(g)(8)Hazard communication20,841$75078.4%
1910.1200(f)(5)(i)Hazard communication20,603$75060.1%
1910.22(d)(1)Walking-working surfaces20,236$75085.2%
1910.213(h)(1)General industry 1910.213(h)(1) requirement20,185$21027.6%
1910.305(b)(1)Electrical wiring methods19,165$82553.9%
1910.304(f)(4)General industry 1910.304(f)(4) requirement18,892$54042.1%
1910.305(b)(2)Electrical wiring methods17,921$75061.2%
1910.1200(f)(5)(ii)Hazard communication17,773$60089.1%
1910.147(c)(7)(i)Lockout/tagout16,954$1,80053.6%
1910.134(e)(1)General industry 1910.134(e)(1) requirement16,883$1,96667.6%
1910.305(g)(2)(iii)Electrical wiring methods16,042$1,22563.6%
1910.309(a)(11022)General industry 1910.309(a)(11022) requirement15,701$3091.2%
1910.134(c)(1)General industry 1910.134(c)(1) requirement15,034$1,70235.2%
1910.22(a)(2)Walking-working surfaces14,952$90057.0%
1910.176(b)General industry 1910.176(b) requirement14,562$1,08341.9%
1910.213(h)(4)General industry 1910.213(h)(4) requirement14,453$37581.2%
1910.157(c)(1)General industry 1910.157(c)(1) requirement14,346$1,05066.3%
1910.303(b)(2)General industry 1910.303(b)(2) requirement14,012$1,50036.7%
1910.147(c)(6)(i)Lockout/tagout13,904$2,55055.1%
1910.305(g)(1)(iii)Electrical wiring methods13,684$75066.5%
1910.303(f)General industry 1910.303(f) requirement13,579$80067.0%
1910.132(d)(2)General industry 1910.132(d)(2) requirement13,437$1,20075.1%
1910.178(l)(1)(i)Powered industrial truck training13,213$2,10016.9%
1910.132(d)(1)General industry 1910.132(d)(1) requirement13,066$1,75044.8%
1910.157(g)(1)General industry 1910.157(g)(1) requirement12,489$1,00061.8%
1910.304(f)(5)(v)General industry 1910.304(f)(5)(v) requirement12,444$42050.7%
1910.95(c)(1)General industry 1910.95(c)(1) requirement12,058$1,62540.5%
1910.134(b)(1)General industry 1910.134(b)(1) requirement12,045$45081.8%
1910.252(a)(2)(ivc)General industry 1910.252(a)(2)(ivc) requirement11,742$15083.6%
1910.134(a)(2)General industry 1910.134(a)(2) requirement11,276$60056.4%
1910.37(k)(2)Exit routes11,247$63062.8%
1910.1000(e)General industry 1910.1000(e) requirement11,114$1,00095.6%
1910.95(b)(1)General industry 1910.95(b)(1) requirement11,018$56055.1%
1910.1200(e)(1)(i)Hazard communication10,825$82579.4%
1910.20(g)(2)General industry 1910.20(g)(2) requirement10,506$36098.7%
1910.151(b)General industry 1910.151(b) requirement10,485$60077.0%
1910.309(a)(40004)General industry 1910.309(a)(40004) requirement10,441$4087.6%
1910.309(a)General industry 1910.309(a) requirement10,101$3067.6%
1910.212(b)Machine guarding10,066$1,00063.5%
1910.147(c)(4)(ii)Lockout/tagout10,027$1,87536.6%
1910.217(c)(1)(i)General industry 1910.217(c)(1)(i) requirement9,983$45021.5%
1910.36(b)(4)General industry 1910.36(b)(4) requirement9,977$60046.7%
1910.178(l)Powered industrial trucks9,827$75049.1%
1910.22(b)(1)Walking-working surfaces9,823$48063.3%
1910.157(d)(3)(i)General industry 1910.157(d)(3)(i) requirement9,702$3086.5%
1910.106(e)(6)(ii)General industry 1910.106(e)(6)(ii) requirement9,547$52561.7%
1910.157(g)(2)General industry 1910.157(g)(2) requirement9,475$97553.8%
1910.219(c)(2)(i)Mechanical power-transmission apparatus9,147$97538.9%
1910.134(f)(2)General industry 1910.134(f)(2) requirement8,845$2,42578.6%
1910.217(e)(1)(i)General industry 1910.217(e)(1)(i) requirement8,814$90070.7%
1910.213(c)(1)General industry 1910.213(c)(1) requirement8,805$30018.6%
1910.107(b)(5)(i)General industry 1910.107(b)(5)(i) requirement8,684$60060.0%
1910.157(a)(5)General industry 1910.157(a)(5) requirement8,596$3095.4%
1910.101(b)General industry 1910.101(b) requirement8,562$87546.8%
1910.219(f)(1)Mechanical power-transmission apparatus8,515$30047.9%
1910.157(e)(3)General industry 1910.157(e)(3) requirement8,510$75082.4%
1910.253(b)(4)(iii)General industry 1910.253(b)(4)(iii) requirement8,414$1,05038.6%
1910.178(l)(6)Powered industrial trucks8,172$1,40076.9%
1910.178(q)(7)Powered industrial trucks7,941$1,60069.0%
1910.304(a)(2)General industry 1910.304(a)(2) requirement7,907$70066.0%
1910.219(b)(1)Mechanical power-transmission apparatus7,870$38239.3%
1910.107(c)(6)General industry 1910.107(c)(6) requirement7,853$35050.8%
1910.303(b)(1)General industry 1910.303(b)(1) requirement7,810$1,12524.3%
1910.106(e)(6)(i)General industry 1910.106(e)(6)(i) requirement7,549$60052.9%
1910.37(a)(3)Exit route maintenance7,537$2,55030.2%
1910.38(a)(1)General industry 1910.38(a)(1) requirement7,417$75055.7%
1910.303(g)(1)(ii)General industry 1910.303(g)(1)(ii) requirement7,414$1,20058.8%
1910.22(b)(2)Walking-working surfaces7,159$10084.9%
1910.22(c)Walking-working surfaces7,159$50040.9%
1910.107(g)(2)General industry 1910.107(g)(2) requirement7,126$50066.2%
1910.309(a)(25051)General industry 1910.309(a)(25051) requirement7,114$4078.1%
1910.106(e)(2)(ivd)General industry 1910.106(e)(2)(ivd) requirement7,082$50063.7%
1910.134(c)(2)(i)General industry 1910.134(c)(2)(i) requirement7,015$1,05085.6%
1910.134(f)(1)General industry 1910.134(f)(1) requirement6,982$1,12585.6%
1910.157(a)(2)General industry 1910.157(a)(2) requirement6,971$3089.1%
1910.157(c)(4)General industry 1910.157(c)(4) requirement6,960$75072.2%
1910.178(l)(4)(iii)Powered industrial trucks6,904$2,10049.8%
1910.215(a)(1)General industry 1910.215(a)(1) requirement6,797$17539.9%
1910.107(e)(2)General industry 1910.107(e)(2) requirement6,747$37561.8%
1910.20(g)(1)(i)General industry 1910.20(g)(1)(i) requirement6,731$50090.4%
1910.25(d)(1)(x)General industry 1910.25(d)(1)(x) requirement6,641$8079.7%
1910.213(i)(1)General industry 1910.213(i)(1) requirement6,500$35045.0%
1910.213(c)(3)General industry 1910.213(c)(3) requirement6,464$48085.8%
1910.24(h)General industry 1910.24(h) requirement6,457$75059.6%
1910.23(a)(8)General industry 1910.23(a)(8) requirement6,410$75050.6%
1910.1025(d)(2)General industry 1910.1025(d)(2) requirement6,353$75065.4%
1910.20(g)(1)(iii)General industry 1910.20(g)(1)(iii) requirement6,342$32098.2%
1910.219(c)(4)(i)Mechanical power-transmission apparatus6,314$1,10052.1%
1910.305(g)(2)(ii)Electrical wiring methods6,310$1,00059.1%
1910.252(a)(2)(iib)General industry 1910.252(a)(2)(iib) requirement6,263$18077.5%
1910.23(d)(1)(iii)General industry 1910.23(d)(1)(iii) requirement6,169$60066.7%
1910.95(d)(1)General industry 1910.95(d)(1) requirement6,083$1,36068.2%
1910.36(d)(1)General industry 1910.36(d)(1) requirement6,059$1,50042.3%
1910.157(e)(2)General industry 1910.157(e)(2) requirement6,035$1,00079.4%
1910.37(q)(2)Exit routes6,007$75087.5%
1910.213(d)(1)General industry 1910.213(d)(1) requirement5,878$32023.7%
1910.217(b)(4)(i)General industry 1910.217(b)(4)(i) requirement5,842$45048.1%
1910.176(a)General industry 1910.176(a) requirement5,706$1,50057.6%
1910.179(j)(2)(iii)General industry 1910.179(j)(2)(iii) requirement5,630$75070.6%
1910.213(c)(2)General industry 1910.213(c)(2) requirement5,620$54079.4%
1910.106(g)(8)General industry 1910.106(g)(8) requirement5,595$3591.4%
1910.138(a)General industry 1910.138(a) requirement5,558$2,00057.5%
1910.107(g)(7)General industry 1910.107(g)(7) requirement5,556$20086.2%
1910.23(d)(1)(ii)General industry 1910.23(d)(1)(ii) requirement5,517$50072.4%
1910.134(b)(6)General industry 1910.134(b)(6) requirement5,487$35090.7%
1910.95(k)(1)General industry 1910.95(k)(1) requirement5,428$1,50078.0%
1910.106(e)(2)(iva)General industry 1910.106(e)(2)(iva) requirement5,408$42055.6%
1910.1030(c)(1)(i)General industry 1910.1030(c)(1)(i) requirement5,403$1,37531.3%
1910.106(e)(9)(iii)General industry 1910.106(e)(9)(iii) requirement5,358$60067.3%
1910.1025(l)(1)(i)General industry 1910.1025(l)(1)(i) requirement5,354$90073.8%
1910.141(a)(3)(i)General industry 1910.141(a)(3)(i) requirement5,325$70072.9%
1910.147(d)(4)(i)Lockout/tagout5,273$3,00048.4%
1910.157(a)(1)General industry 1910.157(a)(1) requirement5,272$3086.2%
1910.20(g)(1)(ii)General industry 1910.20(g)(1)(ii) requirement5,255$32098.6%
1910.184(e)(1)General industry 1910.184(e)(1) requirement5,194$1,00069.7%
1910.134(d)(1)(iii)General industry 1910.134(d)(1)(iii) requirement5,179$2,00061.4%
1910.219(i)(2)Mechanical power-transmission apparatus5,158$35066.4%
1910.1000(a)(2)General industry 1910.1000(a)(2) requirement5,105$1,40049.2%
1910.217(c)(2)(ia)General industry 1910.217(c)(2)(ia) requirement5,103$63727.0%
1910.179(m)(1)General industry 1910.179(m)(1) requirement5,061$30084.7%
1910.213(b)(3)General industry 1910.213(b)(3) requirement5,011$67536.2%
1910.157(d)(2)(i)General industry 1910.157(d)(2)(i) requirement5,003$3091.1%
1910.107(b)(5)(iv)General industry 1910.107(b)(5)(iv) requirement4,900$60060.1%
1910.147(c)(5)(i)Lockout/tagout4,857$1,35044.8%
1910.252(e)(2)(iii)General industry 1910.252(e)(2)(iii) requirement4,841$5061.6%
1910.134(b)(3)General industry 1910.134(b)(3) requirement4,796$60086.1%
1910.1000(c)General industry 1910.1000(c) requirement4,768$1,00055.1%
1910.307(b)General industry 1910.307(b) requirement4,741$72039.9%
1910.213(h)(3)General industry 1910.213(h)(3) requirement4,725$24069.0%
1910.179(b)(5)General industry 1910.179(b)(5) requirement4,705$35080.2%
1910.95(g)(1)General industry 1910.95(g)(1) requirement4,680$1,58764.6%
1910.305(b)(1)(ii)Electrical wiring methods4,657$2,55034.4%
1910.242(a)General industry 1910.242(a) requirement4,617$72064.6%
1910.132(f)(1)General industry 1910.132(f)(1) requirement4,595$1,87578.4%
1910.37(b)(2)Exit routes4,585$1,63058.4%
1910.157(a)(3)General industry 1910.157(a)(3) requirement4,556$3091.9%
1910.147(c)(6)(ii)Lockout/tagout4,546$1,87580.5%
1910.106(d)(2)(i)General industry 1910.106(d)(2)(i) requirement4,537$45061.7%
1910.305(g)(1)(i)Electrical wiring methods4,511$80063.7%
1910.157(d)(3)(iv)General industry 1910.157(d)(3)(iv) requirement4,474$3096.4%
1910.252(a)(2)(ivc0)General industry 1910.252(a)(2)(ivc0) requirement4,460$3068.5%
1910.243(c)(1)General industry 1910.243(c)(1) requirement4,377$36026.9%
1910.243(c)(3)General industry 1910.243(c)(3) requirement4,356$30030.9%
1910.134(b)(5)General industry 1910.134(b)(5) requirement4,328$36089.0%
1910.332(b)(1)General industry 1910.332(b)(1) requirement4,325$2,10033.6%
1910.95(l)(1)General industry 1910.95(l)(1) requirement4,312$61595.8%
1910.24(b)General industry 1910.24(b) requirement4,258$75048.0%
1910.67(c)(2)(v)General industry 1910.67(c)(2)(v) requirement4,175$2,00011.5%
1910.23(c)(3)General industry 1910.23(c)(3) requirement4,155$70036.0%
1910.107(b)(9)General industry 1910.107(b)(9) requirement4,144$82566.1%
1910.37(q)(5)Exit routes4,143$75085.2%
1910.178(a)(6)Powered industrial trucks4,127$1,50070.1%
1910.219(e)(1)Mechanical power-transmission apparatus4,074$3568.1%
1910.253(b)(2)(ii)General industry 1910.253(b)(2)(ii) requirement4,062$1,00032.1%
1910.134(k)(1)General industry 1910.134(k)(1) requirement4,041$1,40085.9%
1910.95(a)General industry 1910.95(a) requirement4,039$30018.0%
1910.141(d)(2)(ii)General industry 1910.141(d)(2)(ii) requirement4,022$60088.2%
1910.106(d)(4)(i)General industry 1910.106(d)(4)(i) requirement3,993$52552.7%
1910.178(l)(1)(ii)Powered industrial trucks3,981$2,40019.0%
1910.179(j)(3)General industry 1910.179(j)(3) requirement3,976$1,30071.5%
1910.146(c)(2)General industry 1910.146(c)(2) requirement3,956$1,99561.0%
1910.309(a)(40010)General industry 1910.309(a)(40010) requirement3,950$3591.6%
1910.134(c)(2)(ii)General industry 1910.134(c)(2)(ii) requirement3,882$1,80063.7%
1910.303(g)(1)General industry 1910.303(g)(1) requirement3,875$2,36546.6%
1910.146(c)(1)General industry 1910.146(c)(1) requirement3,862$1,75027.8%
1910.179(j)(2)(iv)General industry 1910.179(j)(2)(iv) requirement3,846$45084.1%
1910.309(a)(25042)General industry 1910.309(a)(25042) requirement3,835$4063.6%

29 CFR Part 1926 — Construction

96 standards listed here, with 1,306,707 citation items between them.

StandardShort titleCitation itemsMedian proposed penaltyEnded at $0
1926.501(b)(13)Residential fall protection89,264$3,2006.1%
1926.100(a)Construction 1926.100(a) requirement61,568$75020.8%
1926.501(b)(1)Unprotected sides and edges fall protection46,410$2,0009.6%
1926.1053(b)(1)Portable ladder extension43,190$2,00014.2%
1926.102(a)(1)Construction 1926.102(a)(1) requirement40,753$1,80017.5%
1926.21(b)(2)Construction safety training40,217$1,22539.8%
1926.503(a)(1)Fall protection training program38,059$2,00049.6%
1926.59(e)(1)Construction 1926.59(e)(1) requirement33,560$35044.0%
1926.652(a)(1)Construction 1926.652(a)(1) requirement29,600$2,50017.2%
1926.20(b)(2)Construction safety program inspections29,066$1,60038.5%
1926.451(g)(1)Scaffold fall protection28,871$1,50020.2%
1926.20(b)(1)Construction safety and health program28,488$90040.5%
1926.500(d)(1)Construction 1926.500(d)(1) requirement27,283$32023.6%
1926.453(b)(2)(v)Construction 1926.453(b)(2)(v) requirement26,086$1,70010.0%
1926.25(a)Construction 1926.25(a) requirement25,229$45057.3%
1926.451(e)(1)Scaffold access23,856$1,50018.7%
1926.59(h)Construction 1926.59(h) requirement23,733$36057.2%
1926.404(b)(1)(i)Construction 1926.404(b)(1)(i) requirement22,431$60030.7%
1926.404(f)(6)Construction 1926.404(f)(6) requirement21,370$60047.2%
1926.400(h)(1)Construction 1926.400(h)(1) requirement21,133$20066.9%
1926.451(b)(1)Scaffolds20,190$1,50011.4%
1926.501(b)(10)Roofing low-slope fall protection18,620$2,5209.2%
1926.28(a)Construction 1926.28(a) requirement18,394$42022.9%
1926.454(a)Construction 1926.454(a) requirement16,170$1,50049.8%
1926.59(g)(1)Construction 1926.59(g)(1) requirement15,590$30065.2%
1926.451(d)(10)Scaffolds15,014$45018.4%
1926.651(c)(2)Construction 1926.651(c)(2) requirement13,627$1,50015.3%
1926.152(a)(1)Construction 1926.152(a)(1) requirement13,546$30068.7%
1926.651(k)(1)Construction 1926.651(k)(1) requirement13,003$1,50032.4%
1926.501(b)(11)Fall protection duty to have protection12,281$2,8009.9%
1926.451(a)(4)Scaffolds11,971$30029.3%
1926.451(g)(1)(vii)Scaffolds11,659$1,96618.5%
1926.50(f)Construction 1926.50(f) requirement11,475$12095.4%
1926.350(a)(9)Construction 1926.350(a)(9) requirement11,262$45065.0%
1926.651(j)(2)Construction 1926.651(j)(2) requirement10,938$1,50021.9%
1926.401(c)Construction 1926.401(c) requirement10,695$15080.3%
1926.500(b)(1)Construction 1926.500(b)(1) requirement10,581$30028.9%
1926.1052(c)(1)Construction 1926.1052(c)(1) requirement10,431$75027.6%
1926.304(f)Construction 1926.304(f) requirement10,348$24051.9%
1926.451(c)(2)Scaffolds10,046$1,12529.6%
1926.1053(b)(4)Ladder use only as designed9,569$1,75534.5%
1926.401(a)(1)Construction 1926.401(a)(1) requirement9,566$9064.6%
1926.450(a)(10)Construction 1926.450(a)(10) requirement9,543$16069.1%
1926.1060(a)Construction 1926.1060(a) requirement9,373$1,50068.5%
1926.701(b)Construction 1926.701(b) requirement8,964$1,00013.8%
1926.404(b)(1)(ii)Construction 1926.404(b)(1)(ii) requirement8,951$60035.3%
1926.59(g)(8)Construction 1926.59(g)(8) requirement8,826$45054.4%
1926.451(g)(4)(i)Scaffolds8,763$1,50026.7%
1926.451(f)(7)Scaffolds8,745$1,50039.0%
1926.403(b)(2)Construction 1926.403(b)(2) requirement8,383$75040.1%
1926.450(a)(9)Construction 1926.450(a)(9) requirement8,383$17559.8%
1926.300(b)(2)Construction 1926.300(b)(2) requirement8,335$25036.4%
1926.405(g)(2)(iv)Construction 1926.405(g)(2)(iv) requirement8,273$75060.9%
1926.451(a)(13)Scaffolds8,021$50033.1%
1926.95(a)Construction 1926.95(a) requirement8,014$1,05020.3%
1926.416(e)(1)Construction 1926.416(e)(1) requirement7,035$1,00054.2%
1926.1051(a)Construction 1926.1051(a) requirement6,928$1,20023.8%
1926.150(c)(1)(i)Construction 1926.150(c)(1)(i) requirement6,882$45070.3%
1926.50(d)(1)Construction 1926.50(d)(1) requirement6,876$22588.3%
1926.503(b)(1)Fall protection training6,838$1,25079.5%
1926.1053(b)(13)Top step ladder use6,833$1,60031.3%
1926.451(f)(3)Scaffolds6,645$1,50037.2%
1926.350(j)Construction 1926.350(j) requirement6,468$36068.4%
1926.501(b)(4)(i)Fall protection duty to have protection5,966$2,00018.9%
1926.500(e)(1)(iv)Construction 1926.500(e)(1)(iv) requirement5,739$20068.1%
1926.405(a)(2)(iii)Construction 1926.405(a)(2)(iii) requirement5,685$60054.6%
1926.500(e)(1)(iii)Construction 1926.500(e)(1)(iii) requirement5,576$20072.7%
1926.403(i)(2)(i)Construction 1926.403(i)(2)(i) requirement5,271$75020.0%
1926.651(i)(1)Construction 1926.651(i)(1) requirement5,203$35046.8%
1926.450(a)(2)Construction 1926.450(a)(2) requirement5,181$12075.5%
1926.405(b)(2)Construction 1926.405(b)(2) requirement5,160$75044.4%
1926.550(b)(2)Construction 1926.550(b)(2) requirement5,121$60062.7%
1926.652(b)Construction 1926.652(b) requirement5,049$50016.5%
1926.1053(b)(16)Ladders4,991$1,22546.9%
1926.501(b)(14)Fall protection duty to have protection4,932$1,50023.5%
1926.451(e)(10)Scaffolds4,834$32035.9%
1926.50(c)Construction 1926.50(c) requirement4,818$45072.5%
1926.300(b)(1)Construction 1926.300(b)(1) requirement4,725$75015.3%
1926.501(b)(4)(ii)Fall protection duty to have protection4,532$1,20024.7%
1926.416(a)(1)Construction 1926.416(a)(1) requirement4,502$2,80020.3%
1926.760(a)(1)Construction 1926.760(a)(1) requirement4,492$2,80010.6%
1926.401(j)(1)Construction 1926.401(j)(1) requirement4,489$4085.8%
1926.452(c)(2)Construction 1926.452(c)(2) requirement4,460$1,25034.0%
1926.405(a)(2)(iie)Construction 1926.405(a)(2)(iie) requirement4,420$60051.7%
1926.150(a)(1)Construction 1926.150(a)(1) requirement4,413$45068.3%
1926.105(a)Construction 1926.105(a) requirement4,306$1,00014.7%
1926.400(a)Construction 1926.400(a) requirement4,189$16074.8%
1926.602(a)(9)(i)Construction 1926.602(a)(9)(i) requirement4,156$45062.9%
1926.500(c)(1)Construction 1926.500(c)(1) requirement4,145$35027.5%
1926.652(h)Construction 1926.652(h) requirement4,127$24060.4%
1926.405(b)(1)Construction 1926.405(b)(1) requirement4,084$75043.8%
1926.405(a)(2)(iij)Construction 1926.405(a)(2)(iij) requirement4,073$45072.1%
1926.451(a)(2)Scaffolds4,024$36039.6%
1926.602(a)(9)(ii)Construction 1926.602(a)(9)(ii) requirement4,007$48044.6%
1926.451(d)(3)Scaffolds3,948$42049.8%
1926.350(a)(1)Construction 1926.350(a)(1) requirement3,867$40059.4%

29 CFR Part 1904 — Recordkeeping

7 standards listed here, with 109,175 citation items between them.

StandardShort titleCitation itemsMedian proposed penaltyEnded at $0
1904.2(a)Recordkeeping 1904.2(a) requirement69,728$30076.1%
1904.5(a)Recordkeeping 1904.5(a) requirement10,519$10079.3%
1904.39(a)(2)Recordkeeping 1904.39(a)(2) requirement7,319$5,00020.9%
1904.29(b)(1)Injury and illness recordkeeping7,046$90050.7%
1904.29(a)Injury and illness recordkeeping5,039$70056.4%
1904.4Recordkeeping 1904.4 requirement4,976$10077.6%
1904.5(c)Recordkeeping 1904.5(c) requirement4,548$32087.3%

29 CFR Part 1903 — OSHA inspection and citation procedure

3 standards listed here, with 79,288 citation items between them.

StandardShort titleCitation itemsMedian proposed penaltyEnded at $0
1903.2(a)(1)OSHA inspection and citation procedure 1903.2(a)(1) requirement64,017$25080.5%
1903.2(a)OSHA inspection and citation procedure 1903.2(a) requirement8,163$5071.7%
1903.19(c)(1)OSHA inspection and citation procedure 1903.19(c)(1) requirement7,108$3989.4%

Federal OSHA citations by state

Guides: how OSHA penalties are calculated and reduced, the 15-working-day contest deadline, all guides.

CitationPack is private informational software, is not affiliated with OSHA, and does not provide legal advice. Review the methodology.

Analyze my citation Use the free deadline and penalty tools